For example, when the State Historical Preservation Office saw one of the rail bridges held historic significance, the team rehabilitated it instead of constructing a new bridge. The team was responsive and flexible to the needs of the project. ![]() The team performed a complex scope of work, including excavation requiring temporary retaining structures, at-grade site improvements, retaining walls, underground tunnel work, rail bridges, roadway work, structural and architectural work, concrete pouring and asphalt paving. This high-volume urban commuter light rail connects the newly upgraded Penn Station with the historic Broad Street Station on the Morris and Essex line to serve a new Performing Arts Center, Bear’s Baseball Stadium and Washington Park.Ĭonti was the general contractor for the project, constructing three miles of embedded track work with catenary structures for power traction, new signal systems and five new station stops. Conti helped link historic and modern downtown Newark, enabling the city to continue to set the standard for urban transformation.Ī significant part of the redevelopment of downtown Newark, New Jersey’s largest city, was the Newark-Elizabeth Rail Link (NERL) extension project.
0 Comments
Leave a Reply. |